Aircraft Composites Factory

HAUPTINFORMATION

  • Duration of the project: 10/03/2017 – 31/03/2018
  • Project location: Tbilisi

For the Aircraft Composites Factory, we manufactured metal structures, as well as installed and performed assembly work.