Aircraft Composites Factory
HAUPTINFORMATION
- Duration of the project: 10/03/2017 – 31/03/2018
- Project location: Tbilisi
For the Aircraft Composites Factory, we manufactured metal structures, as well as installed and performed assembly work.
For the Aircraft Composites Factory, we manufactured metal structures, as well as installed and performed assembly work.