Aircraft Composites Factory
Main information
- Duration of the project: 10/03/2017 – 31/03/2018
- Project location: Tbilisi
For the Aircraft Composites Factory, we manufactured metal structures, as well as installed and performed assembly work.
For the Aircraft Composites Factory, we manufactured metal structures, as well as installed and performed assembly work.