Warehouse of Zedazeni beer factory
Main information
- Duration of the project: 12/10/2017 – 31/01/2018
- Project location: Zedazeni
Design, manufacturing and installation of metal structures of Warehouse of Zedazeni beer factory.
Design, manufacturing and installation of metal structures of Warehouse of Zedazeni beer factory.